20th March – Delivering MMC Residential at scale though Last Planner: Case Study

20/03/2025 15:00 IST

PRESENTED BY:

John O’Connell – Senior Contracts Manager – OCC Construction

FACILITATED BY:

To be Confirmed

OVERVIEW:

OCC Construction are delivering the 102-unit Clai Mor design and build development maximising the use of Modern Methods of Construction, with all superstructures built off-site using LGS. Tune in to learn how the lean last planner system can utilise the efficiencies gained on a factory across a live building site and how early collaboration between sub-contractors and design team can cut 20% off the program of residential delivery.